Planned model · no official product photo yet
Conference Recording System
Generate meeting transcripts, minutes, and to-do drafts through planning; it is not guaranteed that an accurate final version will be obtained as soon as the meeting ends. Recording and transcription must be notified and authorized, and released after review by designated personnel.
Consult Now
Consultation Phone:+86 755 8386 6822
- Company Email market@chinasoyo.com
Specifications & configuration
TP-DA03
Specifications are for selection reference only; the actual configuration is subject to the official datasheet and on-site testing.
| Input | On-campus group meetings, cloud meetings, teaching and research office activities: Speech transcription → Speaker diarization → Topic segmentation → Minutes generation: Automatically extract draft to-do items; assignees, times, and task details require manual confirmation: Output: Minutes (Word/PDF), to-do list, original transcript: One-click push to authorized participants (APP / email / OA integration); content must be reviewed and the data receiving scope confirmed first: Search historical meetings by keyword / participant / time |
|---|
Product Description
Generate meeting transcripts, minutes, and to-do drafts through planning; it is not guaranteed that an accurate final version will be available immediately after the meeting ends. Recording and transcription must be notified and authorized, and released after review by designated personnel.
Technical Parameters
- : Input: on-campus group meetings, cloud meetings, teaching and research office activities
- : Speech transcription → speaker diarization → topic segmentation → minutes generation
- : Automatically extract draft to-do items; the person responsible, time, and task content must be manually confirmed
- : Output: minutes (Word/PDF), to-do list, original transcript
- : One-click push to authorized attendees (APP / email / OA integration); content must be reviewed first and the data recipient scope confirmed
- : Search historical meetings by keyword / attendee / time
Features
- Five categories of teaching applications can be enabled on demand, with effectiveness and available languages verified using authorized samples
- TP-DS05 is planned to provide computing power, and TP-DA06 is planned to offer unified recognition, translation, synthesis, and large model interfaces
- A local gateway does not mean data is not transmitted externally; the complete local processing chain and external calls must be verified
- Student data should be collected only as minimally necessary, with tiered access and limited retention, and applicable guardian consent requirements must be implemented
- Automated evaluation and generated content are for assistance only; publication and high-impact use require manual review and verification
Specifications are for selection reference only; the actual configuration is subject to the official datasheet and on-site testing.
Ask about a real configuration Consultation Phone:+86 755 8386 6822Views: 1034